Washington, DC Bids > Bid Detail

Façade Stabilization, TMFJB, Wash DC

Agency: ARCHITECT OF THE CAPITOL
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159353159954442
Posted Date: Jan 31, 2023
Due Date: Mar 3, 2023
Solicitation No: AOCACB23R0005
Source: https://sam.gov/opp/4c70c83e4f...
Follow
Façade Stabilization, TMFJB, Wash DC
Active
Contract Opportunity
Notice ID
AOCACB23R0005
Related Notice
AOCACB23R0005
Department/Ind. Agency
ARCHITECT OF THE CAPITOL
Sub-tier
ARCHITECT OF THE CAPITOL
Office
ACQUISITION & MATERIAL MAN DIV
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Jan 31, 2023 09:33 am EST
  • Original Date Offers Due: Mar 03, 2023 02:00 pm EST
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Mar 18, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Washington , DC 20544
    USA
Description

The following work is the primary focus of the project and will be performed across the entire buildings stone panel



façade assembly.



Remove and replace all sealant in joints that have granite façade panels as a substrate (i.e., stone-to-stone joints



and stone to window joints) and remove and replace weeps at existing through-wall flashing locations, in



conjunction with the sealant work. Joints between granite facade panels and the atrium skylight framing are



excluded from the scope of this project.



Address existing frontside granite panel damage to maintain and provide a consistent watertight enclosure across



the stone panel façade.



Remove and replace existing façade stabilization netting to enable sealant joint replacement and the other façade



work of this project and maintain or replace existing netting anchors.



The Contractor shall provide all supervision, plant, labor, materials, tools, and equipment, to carry out all work and



operations as necessary. All work shall be completed in accordance with all federal, state, District and local laws



and regulations.


Attachments/Links
Contact Information
Contracting Office Address
  • 2nd & D Streets, SW FHOB - Room 264
  • Washington , DC 20515
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >